Design and implementation of a process for dealing with residue containers

Details
Customer
EnBW Kernkraft GmbH
Country
Germany
Location
Philippsburg Nuclear Power Plant
Duration
since 10/2023
Topics

Design and implementation of a process for dealing with residue containers

At the Philippsburg nuclear power plant, a large number of waste containers from the dismantling and decontamination process have accumulated that cannot be transferred directly to the residue management centre. Prior to a potential transfer, the documentation must be checked and, if necessary, the containers reconfigured.

 

Our services at a glance:

  • Review and verification of existing processes, container data and conditions on site. Identification and description of necessary processes.
  • Determination of process utilisation, creation of scenarios for processing containers and preparation of a concept report.
  • On-site verification of processes and assumed times.
  • Identification of optimisation measures for the practical implementation of processes.