Mock-up testing of exhaust air duct of Konrad repository

Details
Customer
Bundesgesellschaft für Endlagerung BGE mbH
Country
Germany
Location
Salzgitter
Duration
2018 – 2019
Topics

Mock-up testing of exhaust air duct of Konrad repository

The planned exhaust air duct of the Konrad repository under construction is equipped with an exhaust air monitoring system designed to avoid any inadmissible release of radioactivity into the environment. To ensure this, Dornier Nuclear Services was commissioned with the experimental determination of the flow conditions in the planned exhaust air duct. For this purpose, a mock-up of the exhaust air duct on a scale of 1:5 will be created. After installation and commissioning of the duct mock-up, its fluid dynamic characteristic will be determined.

On the basis of the findings, a CFD simulation will be conducted and optimisation options developed within the parameters defined in the planning approval decision. These will then be implemented and verified in the duct mock-up.

 

Our services at a glance:

  • Scaling, engineering and installation of the test mock-up
  • Determination of expected flow conditions according to DIN ISO 2889 and KTA 1503
  • Determination of fluid dynamic characteristics of duct mock-up and individual components
  • Determination of flow conditions and particle behaviour in the sampling area by means of Particle Imaging Velocimetry (PIV)
  • Creation of a flow simulation and design of optimisation options
  • Verification of design using the mock-up