Planning and optimisation of the residue management centere (RBZ) for the materials from dismantling

Details
Customer
PreussenElektra GmbH
Country
Germany
Location
Grohnde
Duration
2020 – 2025
Topics

Planning and optimisation of the residue management centere (RBZ) for the materials from dismantling

Our services at a glance:

  • Evaluation of the existing and planned facilities for the RBZ for further usability in dismantling for the Grohnde nuclear power plant
  • Determination and validation of the mass flows for the dismantling masses for the design of the RBZ facilities with regard to the required processing capacities
  • Development of a space utilisation concept for the processing of residues in dismantling and optimisation of the installation locations of the RBZ facilities incl. evaluation and comparison of different variants
  • Development of the logistics concept
  • Determination, preparation and creation of the technical approval requirements for the construction and operation of the RBZ
  • Development of the time specifications for planning, procurement and start-up of the RBZ and monitoring of the developed schedule
  • Checking the processes for completeness and efficiency
  • Creation of a capacity utilisation plan for the workstations of the RBZ and evaluation of the required buffer spaces
  • Identification of the need for action and potential for optimisation
  • Creation of service descriptions for the procurement of the workstations
  • Customer support for the procurement and installation of the technical equipment used in the RBZ until start-up
  • Coordination of interfaces for the construction and operation of the RBZ facilities
  • Planning of administrative measures for special projects in the RBZ