Planning and optimisation of the residue management centere (RBZ) for the materials from dismantling
Details
Customer
PreussenElektra GmbH
Country
Germany
Location
Grohnde
Duration
2020 – 2025
Topics
Planning and optimisation of the residue management centere (RBZ) for the materials from dismantling
Our services at a glance:
Evaluation of the existing and planned facilities for the RBZ for further usability in dismantling for the Grohnde nuclear power plant
Determination and validation of the mass flows for the dismantling masses for the design of the RBZ facilities with regard to the required processing capacities
Development of a space utilisation concept for the processing of residues in dismantling and optimisation of the installation locations of the RBZ facilities incl. evaluation and comparison of different variants
Development of the logistics concept
Determination, preparation and creation of the technical approval requirements for the construction and operation of the RBZ
Development of the time specifications for planning, procurement and start-up of the RBZ and monitoring of the developed schedule
Checking the processes for completeness and efficiency
Creation of a capacity utilisation plan for the workstations of the RBZ and evaluation of the required buffer spaces
Identification of the need for action and potential for optimisation
Creation of service descriptions for the procurement of the workstations
Customer support for the procurement and installation of the technical equipment used in the RBZ until start-up
Coordination of interfaces for the construction and operation of the RBZ facilities
Planning of administrative measures for special projects in the RBZ