Replacement gate for material lock

Details
Customer
EPZ
Country
Netherlands
Location
Borssele
Duration
2025
Topics

Replacement gate for material lock

For the EPZ at the Borssele site in the Netherlands, we took on the engineering for a replacement of the existing shielding gate at the Castor lock.

The aim was to develop a technically reliable and radiation protection-compliant solution that fits seamlessly into the existing infrastructure. The focus was on the design in accordance with current safety requirements, optimised handling and the long-term operational safety of the new gate. Our services included the design planning, static evaluation and documentation-compliant development of the new shielding concept.

The engineering was carried out in close coordination with the customer and in compliance with national and international requirements in the nuclear sector.

Weitere Referenzen

Mehr laden