Sampling system for the GAU case

Details
Customer
EDF
Country
France
Location
Fessenheim
Duration
2018
Topics

Sampling system for the GAU case

On behalf of EDF, we carried out the measurements, design, static calculations and installation of permanent shielding for components with a high dose rate at the Fessenheim site.

The aim of the project was to sustainably reduce radiation exposure for personnel in certain areas of the plant. Based on a precise on-site survey, we developed customised shielding that was permanently integrated into the existing plant technology. The constructions were specially designed for permanent operation under nuclear conditions – with a focus on radiation protection, long-term durability and safe accessibility to the surrounding components.

The implementation was carried out in close coordination with the customer and in compliance with all applicable safety and quality standards.

Weitere Referenzen

Mehr laden